In 2016, we completed phase 1 of this fine development. The highest of standard were demanded on every element from the developer and they pulled it off.

Specification:

The first phase of 7 houses utilised our closed panel timber frame system. The products used were:

  • External Wall – 0.14W/m2K
  • Floors – Metal web joisting with Egger Peelclean Xtra
  • Windows & Doors – Future proof double glazed PVC windows & doors with a hardwood front door
  • Cladding – Various finishes including timber, brick, render

Detail:

The houses ranged from different sizes but were generally over 3000sqft. Whist they were not complex design, the style and layout were not left found wanting. Every millimetre were carefully planned for and adjusted to make sure that the end product became everything the end client wanted. This methodological form of quality control is not only evident in the timber frame package, but throughout the final finished including the stair and kitchens.

 

We are delighted to have been part of this build and the photos show what a delight is was to be part of.