Case Study – Craylands

  In 2015, TTFC secured a contract for 50 new social housing units in Essex. The project was spread over 12 months and ranged from 2 storey houses to 3 storey apartments blocks. The kit comprised of 140×38 CLS stud to the external wall with 120mm insulation factory fitted. TTFC also installed the vapour control layer […]

Read More

Case Study – Yvette & Carston

  Specification: External wall U-Value – 0.14W/m2K ACH @ 50 pascal: 2.8 TTFC system – Closed panel timber frame Windows – Double Glazed Woodgrain PVC Heating system – Air to water heat pump HRV system – Yes Photovoltaic Panels – Yes  

Read More

Case Study – Langford

In 2016, we completed phase 1 of this fine development. The highest of standard were demanded on every element from the developer and they pulled it off. Specification: The first phase of 7 houses utilised our closed panel timber frame system. The products used were: External Wall – 0.14W/m2K Floors – Metal web joisting with […]

Read More

Case Study – City Renovations – 13 Bungalows

  Specification: External wall U-Value – 0.14W/m2K TTFC system – Closed panel timber frame Windows – Double Glazed Woodgrain PVC Solar Panels – Yes     From 2015, we completed three old garage site in Milton Keynes. They consisted of 13 bungalow specially design for disabled access. The key element was the installation on site. […]

Read More

Case Study – Lisheen Nursing Home

Summary In 2012, we completed a 30,000sqft nursing home in Rathcoole, Dublin. The project was split into 3 phases and was an extension to an existing care unit. When we re-visited the building last year the building has been performing very well and still looked as good as when it was completed. The building was […]

Read More

Case Study – Award Winning Home

  Back in 2011, TTFC Ltd received an award on a self-build home from Isover Saint Gobain. The Sammin House in Ireland was awarded as one of the most remarkable energy efficient construction projects in Europe. The main objective was to build a highly efficient, airtight dwelling in timber frame construction. When dealing with individual […]

Read More

Case Study – Sheridan House

In 2010, TTFC completed a self-build closed panel timber frame house in Kilkenny, Ireland. The 4,500sqft house was completed in just 2 weeks with the overall package including: 0.14W/m2K External Wall U-Value Metal Web Floor Joists Attic truss with flooring   Q&A We asked the client how the house has performed over the years recently […]

Read More

Case Study – BAM

  Specification: TTFC system – Closed panel timber frame St James’ Staff Facilities This project was constructed on site due to its continuous curved wall. The 500m2 building was designed off-site, with all products being sent to site ready to be assembled. It was a feature building for St James’ and really stands out with […]

Read More

Case Study – Monart Spa

  Monart House Hotel & Spa In 2005, TTFC were contracted to construct bedrooms at Monart House Hotel & Spa. Monart, which has been voted in the top 3 spas in the world plus many more awards, is situated just 20 minutes from our head office in Wexford, Ireland. This high profile project was completed using […]

Read More

Case Study – Retirement Village

Overview One of our proudest developments, this site of 50 houses and nursing home was completed using our standard timber frame option. The contractor decided to use timber frame due to the speed and accuracy of off-site timber frame construction. The tight six month build programme involved 4 units being delivered per week and the nursing home […]

Read More

Case Study – Ferrycarrig Hotel Wexford & Killerig Hotel

Ferrycarrig Hotel – Extension In 1999, TTFC secured its  first high profile project. Ferrycarrig Hotel, expanded a bedroom block to the rear of the Hotel with a view of the picturesque river Slaney. TTFC to provided the timber frame infill panels between the structural steel of the 5 storey extension. The project was not only sold, […]

Read More